Adams Elementary and Valley View Elementary

Location:
Wapato, WA and Toppenish, WA
Year Built:
2017
District:
Central Kitsap School District
Type:
Addition
Photos:
© atelierjones
About this Project
The Fairview Middle School Replacement project is a design-build collaboration with Skanska, featuring extensive use of cross-laminated timber (CLT) to create a warm, biophilic learning environment rooted in the natural beauty of its forested site. The project includes construction of new classrooms, a student commons, distributed administration, kitchen, community health center, and the modernization of existing gym, band, and choir facilities. From materials and massing to program organization, the new Fairview Middle School is designed to feel like an extension of the surrounding forest—supporting student wellness, identity, and connection to place.
Project Highlights
- Modular Flat-Pack CLT schools adaptable to variety of sites
- Local Cascadia CLT from DR Johnson
Building Statistics
- Building Area: 70,619 sf per modular classroom unit, 4,325 sf total
- Areas featuring Mass Timber: All walls and roofs of the modular classroom
Project Team
- Architect: atelierjones, NAC Architects
- Structural Engineer: HVE Engineering
- General Contractor: Graham Construction
- Mass Timber Installer/Manufacturer: DR Johnson