< All School Projects

Evergreen High School

Primarily Mass Timber
Steel Building with Mass Timber Elements

Location:

Seattle, WA

Year Built:

2025

District:

Highline Public Schools

Type:

New Construction

Photos:

© Bassetti Architects/ HMC

About this Project

The 214,000 square foot replacement of Evergreen High School includes a three-story academic building and two-story activity building. The story of Evergreen High School’s redevelopment is interwoven between people and place. The place is a bucolic landscape that has been sculpted over time by glaciers, erosion, and human development. The site is characterized by a relatively natural yet urban setting that includes undulating landscape surfaces, mature trees, structured playfields, and Lakewood County Park.

The design seeks to develop a safe place nestled into the elegant site; welcoming entries that provide shelter and support security for all; engaging public spaces that encourage community gathering; differentiated spaces that support diverse social and academic activities and interactions; quiet spaces that enhance collaboration and individual focus; learning neighborhoods that support rigorous learning and personalized connections between students and adults; flexible layouts that support evolving pedagogies; and visible learning that inspires exploration and critical thinking.

Project Highlights

Building Statistics

  • Building Area: 214,000 SF
  • Areas featuring Mass Timber: Primarily Mass Timber - The Academic Building floor and roof structure use CLT panels, beams and columns are glued laminated timber, Steel Building with Mass Timber Elements - The Activity Building commons and hallways are built with Glulam beams and columns, and CLT roof panels

Project Team

  • Architect: Bassetti Architects / A Design Studio of HMC Architects
  • Structural Engineer: PCS Structural Solutions
  • General Contractor: Cornerstone General Contractors
  • Timber Installer: Carpentry Plus
  • Timber Manufacturer: SmartLam

Project Gallery

Explore More Mass Timber School Projects

Shoreline, WA

Kellogg Middle School

Kellogg Middle School, the first acoustic dowel-laminated timber (ADLT) system installation in the U.S., is designed to address the academic, social, and emotional needs of the teenage learner.

Steel Building with Mass Timber Elements

Renton, WA

Hilltop Heritage Elementary School

The new 85,000 SF school highlights sustainability by incorporating a mass timber structure that creates a warm and inviting space for the students and staff.

Steel Building with Mass Timber Elements

Lake Oswego, OR

Lakeridge Middle School

Warm and welcoming, Lakeridge Middle School uses an exposed wood structural system designed to connect students with nature.

Mass Timber and Wood Frame Hybrid